It is necessary to keep the oil used in the cooling system of transformer in the tank and not to decrease the amount of oil used in the transformer to work properly. The reduction in the amount of transformer oil will cause the transformer to burn over time.
In our leakage test platform, which we have designed as Akabe Enerji A.Ş.penetrating fluid is applied to the welding areas of transformer tank and the tanks are kept under 0.10~0.30 bar pressure for 15 minutes. Under purple light, the penetrating liquid, which receives the phosphorous green color, is observed with the eye at the welding edges, whether it has leaked to outer surface.
As a result of the repeated testing process, zero leakage transformer tanks are manufactured in our factory.
For each tank produced, a test report containing the tank serial number is given to our customers.
We guatantee that you will not have any leakage problems.
Since it has been founded, Akabe Enerji A.Ş. has completed numerous projects successfully and now offering to you its experience, know-how and the understanding of ethical bussiness in manufacturing transformer tanks, wave walls and radiators. Our company makes customer oriented production in its high tech facilities. In the 3000 m2 production space and with its expert technical team, Akabe Enerji A.Ş. offers its services essentially in those areas;
A brief overview of products and services manufactured at Akabe Trafo's factory:
Steel thickness is 1.2 or 1.5mm, width is 300~1600mm, fin height is 50~400mm and distance between fins is greater than 43 mm.
Thanks to CNC based fully automatic plasma cutting machine and break press machines, tank semi production cutting and bending operations are done in our structure.
Corrugated fin wall type distribution transformer tanks up to 5 MVA and radiator type power transformer tanks up to 25 MVA.
Transformer tank leakage test which affects tank life is performed with our design test platform. We aplply penetrant chemical to and keep tanks under 0.1~0.4 bar pressure then observe for leakages.
Bushing studs, lifting lugs, thermometer pocket, oil filling cap, active part lifting part and conservator connection pipes are welded to cover the plate.
If requested, SA 2.5 shoot blasting is appliedto tanks. Depending on customer request, spray or flow painting and kiln-drying process increases the tank resistance time.